A connection test can succeed while the first commercial transaction fails. The receiving application may not recognize a product, or the shipment may contain different packages from the electronic record. Onboarding needs evidence that both parties can use the information required for the agreed workflow.
Define the business relationship
Document the legal entities, facilities, products, markets, and activities in scope. The product owner, physical shipper, and technical message sender may be different organizations.
Agree who creates each record, when information is sent, how processing is confirmed, and who investigates failures. Complete applicable trading partner authorization checks alongside technical onboarding.
Align master data and interface rules
Reconcile product identifiers, packaging levels, quantities, location mappings, and transaction references. Use representative configurations and controlled test identifiers.
FDA recommends EPCIS for interoperable electronic DSCSA exchange. It also clarifies that DSCSA does not require a specific location identifier such as a GLN, although a partner may request one for its implementation. See FDA’s product tracing questions.
Document the agreed EPCIS version, vocabulary, fields, extensions, and identifier representations. Specify endpoints, authentication, certificates, retries, and correction handling. Keep test and production credentials and routing separate. Use the GS1 EPCIS standard as the technical reference for the selected version.
Test receipt and business processing
Check connectivity, message structure, data interpretation, application outcomes, and recovery as distinct test layers.
AS2 uses message disposition notifications, or MDNs. An MDN can provide evidence about AS2 message handling, but it does not by itself confirm that a downstream business application accepted the shipment data. Agree the meaning of each response. See RFC 4130.
Choose scenarios that reflect the relationship:
- Partial deliveries, split shipments, and mixed lots.
- Case opening, removal, and repacking where aggregation is used.
- Missing fields, unknown identifiers, and rejected messages.
- Duplicate messages, interrupted transfers, delayed events, and corrections.
Approve readiness with evidence
Record the expected result, actual outcome, supporting payloads, and application response for each scenario. Assign defect owners and retest affected workflows after a correction.
Illustrative scenario: An order is split into two shipments. Testing confirms that each delivery carries its own shipment reference and corresponding serial numbers, without duplicating the first receipt.
Before launch, confirm approved settings, resolved blocking defects, assessed remaining issues, active monitoring, support contacts, and agreed cutover procedures. Apply validation and change control according to intended use and the applicable quality framework.
Monitor the first live exchanges
Follow initial transactions from the source activity through recipient processing. Investigate rejections and discrepancies, then transfer ownership to routine support once the agreed stability criteria are met.